Thursday, June 23, 2011
New Access Card
The Management has changed the access system at the main entrance. All residents are required to replace their old access card with the new access card before 30/6/2011. After the dateline, residents without the new access card will be required to registered at the guard house before entry. The access card replacement is free of charge.
Please click here to check the extended management office operating hours for your convenience.
Please click here to check the extended management office operating hours for your convenience.
Thursday, February 24, 2011
Disruption in Power Supply
Please be informed that our in-house Electrical Contractor will be Calibrating and Servicing the Main Switchboard at the Main Switch Room as follows:-
Date : 28/02/2011 (Monday)
Time : 10.00 am to 3.00pm
During the above time, there will be power disruption to all units. The Bomba Lift will be functioning as usual.
Your co-operation on the above matter is much appreciated. We regret for any inconvenience caused.
The Management
24/2/11
Saturday, December 4, 2010
Pick up /Drop Off
Please be informed with immediate effect all Pick Up and Drop Off must be registered at the Guard House.
Residents who are accepting Visitors, Taxi, Fast Food Delivery, etc., kindly inform the Guard House in advance. We strongly advice again in such case if the unit fails to answer the intercom the guards will not allow the Visitors, Taxi, Fast Food Delivery, etc to enter into Prima Duta Condominium.
Your co-operation on the above matter is very much appreciated to maintain tight security and safe living environment in Prima Duta.
The Management
3rd December 2010
Friday, November 12, 2010
Dismantle of Old G.I Pipes at Block D
Please be informed that the contractor will be dismantling the old G.I Pipe from the Water Riser Room.
They will some hacking at the water riser room to dismantle the pipes easily. During this period there will be no disruption to water supply.
The schedule of work is as follows:-
DATE : 12/11/10,15/11/10,16/11/10,18/11/10
TIME : 9.00 AM to 5.00 PM
Our technicians will be present to monitor the works.
Your co-operation on the above matter is much appreciated. We regret for any inconvenience caused.
The Management
9th November 2010
Dismantle of Old G.I Pipes at Block C
Please be informed that the contractor will be dismantling the old G.I Pipe from the Water Riser Room.
They will some hacking at the water riser room to dismantle the pipes easily. During this period there will be no disruption to water supply.
The schedule of work is as follows:-
DATE : 16/11/10,18/11/10,19/11/10,22/11/10
TIME : 9.00 AM to 5.00 PM
Our technicians will be present to monitor the works.
Your co-operation on the above matter is much appreciated. We regret for any inconvenience caused.
The Management
9th November 2010
Tuesday, November 9, 2010
Dismantle of Old G.I Pipes at Block B
Please be informed that the contractor will be dismantling the old G.I Pipe from the Water Riser Room.
They will some hacking at the water riser room to dismantle the pipes easily. During this period there will be no disruption to water supply.
The schedule of work is as follows:-
DATE : 15/11/10,16/11/10,18/11/10,19/11/10
TIME : 9.00 AM to 5.00 PM
Our technicians will be present to monitor the works.
Your co-operation on the above matter is much appreciated. We regret for any inconvenience caused.
The Management
9th November 2010
Wednesday, November 3, 2010
Dismantle of Old G.I Pipes at Block A
Please be informed that the contractor will be dismantling the old G.I Pipe from the Water Riser Room.
They will some hacking at the water riser room to dismantle the pipes easily. During this period there will be no disruption to water supply.
The schedule of work is as follows:-
DATE : 9/11/10 – 12/11/10
TIME : 9.00 AM to 5.00 PM
Our technicians will be present to monitor the works.
Your co-operation on the above matter is much appreciated. We regret for any inconvenience caused.
The Management
3rd November 2010
Wednesday, October 13, 2010
Breakdown of Bomba Lift at Block B
Please be informed that the contractor has troubleshoot the Block B Bomba Lift and found there is problem with main board.
We have placed an order with the contractor for this item, which will take approx 1 week to deliver and install.
Your co-operation on the above matter is much appreciated.
We regret for any inconvenience caused.
The Management
13/10/10
We have placed an order with the contractor for this item, which will take approx 1 week to deliver and install.
Your co-operation on the above matter is much appreciated.
We regret for any inconvenience caused.
The Management
13/10/10
Monday, October 11, 2010
Replacing New Water Pipe at Block D
Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.
The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block D for 30 hours.
The contractor will be working throughout this period to speed up
the piping works.
The total work schedule for the above works is as follows:-
13/10/10 (Wed) 10AM – 14/10/10 (Thu) 4PM
Our technicians will be present to monitor the works.
We advice all residents to store water for their own use during
the above works.
Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.
The Management
7th October 2010
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.
The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block D for 30 hours.
The contractor will be working throughout this period to speed up
the piping works.
The total work schedule for the above works is as follows:-
13/10/10 (Wed) 10AM – 14/10/10 (Thu) 4PM
Our technicians will be present to monitor the works.
We advice all residents to store water for their own use during
the above works.
Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.
The Management
7th October 2010
Friday, October 1, 2010
Replacing New Water Pipe at Block C
Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.
The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block C for 30 hours.
The contractor will be working throughout this period to speed up
the piping works.
The total work schedule for the above works is as follows:-
06/10/10 (Wed,10AM) – 07/10/10 (Thu,4PM)
Our technicians will be present to monitor the works.
We advice all residents to store water for their own use during
the above works.
Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.
The Management
1st October 2010
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.
The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block C for 30 hours.
The contractor will be working throughout this period to speed up
the piping works.
The total work schedule for the above works is as follows:-
06/10/10 (Wed,10AM) – 07/10/10 (Thu,4PM)
Our technicians will be present to monitor the works.
We advice all residents to store water for their own use during
the above works.
Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.
The Management
1st October 2010
Wednesday, September 29, 2010
PRIMA DUTA RESIDENT CARD
without resident card are required to apply for resident card from the
management office with immediate effect.
Please be noted that in accordance to the House Rules 2.0, all residents
above 6 years of age shall be registered with the Management and must
apply for their Resident Card when they move in.
Residents are required to submit 2 color photo of passport size to the
Management Office for application of resident's card. The processing is Free
of Charge.
The Resident Card is for identification purpose and used for common
facilities booking and security.
The Management or Security Guards may require resident to identify himself
or herself with the Resident Card.
For Rental units, the Owner shall notify the Management and furnish their
tenant's particulars to the Management Office.
The security guards will be instructed not to allow any person into Prima Duta
Condominium who do not have resident card or do not produce any lD.
Residents without Resident Card are required to register themselves as a
visitor before allowing into Prima Duta.
Your co-operation on the above matter is very much appreciated to maintain
tight security and safe living environment in Prima Duta.
The Management
23rd September 2010
Friday, September 24, 2010
Replacing New Water Pipe at Block B
Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.
The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block B for 30 hours.
The contractor will be working throughout this period to speed up
the piping works.
The total work schedule for the above works is as follows:-
29/9/10 (10AM) – 30/9/10 (4PM)
Our technicians will be present to monitor the works.
We advice all residents to store water for their own use during
the above works.
Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.
The Management
23rd September 2010
Saturday, September 18, 2010
Replacing New Water Pipe at Block A
Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.
The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block A for 30 hours.
The contractor will be working throughout this period to speed up
the piping works.
The total work schedule for the above works is as follows:-
21/9/10 (10AM) – 22/9/10 (4PM)
Our technicians will be present to monitor the works.
We advice all residents to store water for their own use during
the above works.
Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.
The Management
17th September 2010
Wednesday, September 8, 2010
Cafeteria Closed for Hari Raya
Please be informed that the cafeteria will be closed from 8/9/2010 to 14/9/2010. Business will resume on 15/9/2010 (Wednesday). Thank you.
Thursday, May 27, 2010
Pets
TO ALL OUR VALUED OWNERS/RESIDENTS OF
PRIMA DUTA CONDOMINIUM
RE: Rearing of Pets at Prima Duta Condominium
The management had received numerous complaints from residents concerning pets being kept in the unit and causing nuisance to other residents.
Once again, the management would like to remind all residents that pets (CAT, DOG, RABBIT, BIRD, ETC) are not allowed in the unit as per our House Rules section 3.03.
The Management would like all resident to remove their pets immediately, failing which we will report this matter to DBKL for further action.
Your cooperation in the above matter is highly appreciated.
The Management
27th May 2010
PRIMA DUTA CONDOMINIUM
RE: Rearing of Pets at Prima Duta Condominium
The management had received numerous complaints from residents concerning pets being kept in the unit and causing nuisance to other residents.
Once again, the management would like to remind all residents that pets (CAT, DOG, RABBIT, BIRD, ETC) are not allowed in the unit as per our House Rules section 3.03.
The Management would like all resident to remove their pets immediately, failing which we will report this matter to DBKL for further action.
Your cooperation in the above matter is highly appreciated.
The Management
27th May 2010
Tuesday, May 11, 2010
LPG Gas Pipe Inspection
Please be informed that the LPG Gas contractor will be carrying out inspection on the Gas Pipes and Gas Riser Room from 12/5/10 to 14/5/10 as required by Seruhanjaya Tenaga(ST).
On 13/5/10, there will be interruption in gas flow to your unit as the contractor needs to shut down the main valve from the Gas Malaysia Tank to all the Blocks from 9.00am to 5.00pm.
Your co-operation on the above matter is much appreciated.
We regret for any inconvenience caused.
The Management
On 13/5/10, there will be interruption in gas flow to your unit as the contractor needs to shut down the main valve from the Gas Malaysia Tank to all the Blocks from 9.00am to 5.00pm.
Your co-operation on the above matter is much appreciated.
We regret for any inconvenience caused.
The Management
Thursday, May 6, 2010
Monday, January 4, 2010
Car Sticker Year 2010
TO ALL OUR VALUED OWNERS/RESIDENTS OF
PRIMA DUTA CONDOMINIUMRE: Car Sticker Year 2010 & Car Parking Lots
Kindly be informed that all owners/residents of Prima Duta Condominium are required to renew Car Sticker Year 2010 at our Prima Duta Management Office from 30/12/09 until 30/01/10.
Residents are required to return the expired car sticker for exchange of new car sticker (F.O.C), and update us for the vehicle registration no.
Please be reminded to display the car sticker at your car windscreen at all times to facilitate our security guard to verify Prima Duta residents.
Vehicle without proximity card and car sticker is strictly not allowed to enter Prima Duta Condominium, unless prior consent obtained through intercom or in writing from the owner/resident or management.
Your full co-operation is much appreciated.
The PDC Management
29th December 2009
Subscribe to:
Posts (Atom)