Please be informed that the LPG Gas contractor will be carrying out inspection on the Gas Pipes and Gas Riser Room from 12/5/10 to 14/5/10 as required by Seruhanjaya Tenaga(ST).
On 13/5/10, there will be interruption in gas flow to your unit as the contractor needs to shut down the main valve from the Gas Malaysia Tank to all the Blocks from 9.00am to 5.00pm.
Your co-operation on the above matter is much appreciated.
We regret for any inconvenience caused.
The Management
Tuesday, May 11, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment