Thursday, February 24, 2011

Disruption in Power Supply


Please be informed that our in-house Electrical Contractor will be Calibrating and Servicing the Main Switchboard at the Main Switch Room as follows:-

Date    : 28/02/2011 (Monday)
Time    : 10.00 am to 3.00pm

During the above time, there will be power disruption to all units. The Bomba Lift will be functioning as usual.

Your co-operation on the above matter is much appreciated. We regret for any inconvenience caused.
  
The Management 
24/2/11