Friday, September 24, 2010

Replacing New Water Pipe at Block B


Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.

The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block B for 30 hours.

The contractor will be working throughout this period to speed up
the piping works.

The total work schedule for the above works is as follows:-

29/9/10 (10AM) – 30/9/10 (4PM)

Our technicians will be present to monitor the works.

We advice all residents to store water for their own use during
the above works.

Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.

The Management
23rd September 2010

No comments: