Wednesday, September 29, 2010

PRIMA DUTA RESIDENT CARD

With reference to the above, please be informed that those owners/residents
without resident card are required to apply for resident card from the
management office with immediate effect.

Please be noted that in accordance to the House Rules 2.0, all residents
above 6 years of age shall be registered with the Management and must
apply for their Resident Card when they move in.

Residents are required to submit 2 color photo of passport size to the
Management Office for application of resident's card. The processing is Free
of Charge.

The Resident Card is for identification purpose and used for common
facilities booking and security.

The Management or Security Guards may require resident to identify himself
or herself with the Resident Card.

For Rental units, the Owner shall notify the Management and furnish their
tenant's particulars to the Management Office.

The security guards will be instructed not to allow any person into Prima Duta
Condominium who do not have resident card or do not produce any lD.

Residents without Resident Card are required to register themselves as a
visitor before allowing into Prima Duta.

Your co-operation on the above matter is very much appreciated to maintain
tight security and safe living environment in Prima Duta.

The Management
23rd September 2010

Friday, September 24, 2010

Replacing New Water Pipe at Block B


Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.

The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block B for 30 hours.

The contractor will be working throughout this period to speed up
the piping works.

The total work schedule for the above works is as follows:-

29/9/10 (10AM) – 30/9/10 (4PM)

Our technicians will be present to monitor the works.

We advice all residents to store water for their own use during
the above works.

Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.

The Management
23rd September 2010

Saturday, September 18, 2010

Replacing New Water Pipe at Block A


Please be informed that the contractor will be replacing new water
pipes at roof tank and water meter riser room located at every
floor. The contractors will also be washing the water tank at roof
top.

The time period required to disconnect the old water pipes and to
replace with new water pipes is 30 hours which includes time to dry
the pipe glue. During this period there will be disruption to water
supply at Block A for 30 hours.

The contractor will be working throughout this period to speed up
the piping works.

The total work schedule for the above works is as follows:-

21/9/10 (10AM) – 22/9/10 (4PM)

Our technicians will be present to monitor the works.

We advice all residents to store water for their own use during
the above works.

Your co-operation on the above matter is much appreciated. We
regret for any inconvenience caused.

The Management
17th September 2010

Wednesday, September 8, 2010

Cafeteria Closed for Hari Raya


Please be informed that the cafeteria will be closed from 8/9/2010 to 14/9/2010. Business will resume on 15/9/2010 (Wednesday). Thank you.