The meeting started at 8:45PM and ended at 10:00PM.
We were informed that two roof triangular facade of block D has been taken down because they were breaking apart. We have decided to make a claim to the developer to rectify the problem.
The water piping replacement project has just started so please bear with the noise from the work. The management and contractor have a work plan in place to minimize the time of water disruption. Anyway, we will notify the units in advance before they are affected. Individual water filter installed in the riser room at each floor is no longer allowed by the management. The management will inform the affected units to dismantle it and please make arrangement to re-install it inside your condo.